Skip to main content Skip to search Skip to main navigation
✔ 10,000 articles for protection, hygiene & packaging
✔ top price-performance ratio
✔ ready to ship in 24h
✔ tested quality

Company headquarters

Logistics power: Franz Mensch in Buchloe, Allgäu
Thanks to the logistics complex on 14,000 m2 with 16 truck docking stations and a fully automated high-bay warehouse, Franz Mensch delivers more reliably and quickly than almost anyone else in the industry. The high availability of goods of 99 % is a top value and allows our customers maximum planning security.

Außenansicht des Firmengebäudes der Firma Franz Mensch

Gigantic dimensions: The Franz Mensch logistics centre

2026: The largest construction project in the company’s history


More power for your security of supply: We are doubling our storage capacity and investing €30 million in modern, AI-supported high-tech logistics. Commissioning is scheduled for the end of 2026. 

The extension will be built directly adjacent to the existing company building on Werner-von-Siemens-Straße and will cover an area of 15,000 square metres. This is roughly the size of two football pitches and means a doubling of the logistics space. The centrepiece will be the highly automated, intelligent warehouse. This includes: automated intralogistics, an innovative AutoStore system with around 64,700 bins for small parts, and a doubling of the automated pallet warehouse with an additional 35,000 pallet spaces. 

The planned AutoStore facility with 64,700 boxes is a highly automated warehouse system. Robots move along a grid structure, retrieve boxes containing the required goods and transport them to workstations – completely autonomously. The system saves up to 60% of storage space, operates quickly, efficiently and around the clock. 

The ground-breaking ceremony took place in April 2025. Completion and commissioning are scheduled for the end of 2026. During the construction period, the existing site will remain fully operational. With this major project, Franz Mensch is consistently pursuing the goal of further expanding its position as a leading company in the B2B hygiene products sector and meeting the growing demands of its customers.

Take advantage of our state-of-the-art warehouse

Creation of our logistics center

Das Firmengebäude der Franz Mensch GmbH

Construction of the high bay warehouse 2017

In September 2017, Franz Mensch moves to Buchloe. With a height of 25 metres, the high-bay warehouse is visible from afar. Experience here in the video how the ultra-modern company headquarters came into being.

Our high bay warehouse:

  • 44.000 pallet bays
  • Height: 25m
  • Area: 5.600qm²


Promotion and support
We received support from the Free State of Bavaria
and the European Union.

Construction of the 2022 pandemic camp:
Iron reserve of masks and protective clothing


Franz Mensch's pandemic warehouse has been in operation since April 2022. The semi-automatic high-bay warehouse with a height of over 20 meters holds important protective clothing for times of crisis. The aim is to have an immediately available reserve so that bottlenecks do not arise in the first place when the demand for masks and the like explodes due to the crisis.

Whether it's Corona, Ebola, Sars or avian flu, the aim is to avoid an emergency like the one in spring 2020, when masks were completely sold out. Among other things, the pandemic stockpile will hold an iron reserve of about 20 to 30 million mouth masks. In a rolling system, the goods will be sold out regularly and always replenished with current goods.

Our pandemic warehouse:

  • 20.000 pallet spaces
  • Height: 20m
  • Area: 3.100m²
  • Investement of around 7 million euros

Der Firmengebäude der Franz Mensch GmbH

Read more about Franz Mensch and what is important to us here: